Configuring The Schedule Interface For Runtime Interaction; Schedule The Events During Runtime - Panasonic HMWIN User Manual

Touch
Hide thumbs Also See for HMWIN:
Table of Contents

Advertisement

The Actions should be programmed in the Studio. Actions cannot be modified at Runtime, all other
NOTE
scheduler parameters can be modified in Runtime (such as, type, mode, location, etc.)

21.5 Configuring the Schedule Interface for Runtime Interaction

The User Interface for Runtime is the Widget called Scheduler. To add this to the project, just drag and drop
it from the advanced section of the Widget Gallery. Once the object is on the page, in order to select the
Scheduler items to be displayed in the Widget, click on the + button of the "Name" property that is part of the
Scheduler object. A Dialog page will open (as shown in the figure below) where you can add the schedule
from the list at Runtime.
Figure 191
In the Properties pane, you can customize the scheduler Widget to adjust row colors, column width, and
show or hide column, etc.

21.6 Schedule the Events during Runtime

If you defined the scheduler GUI on a page (as described in the chapter
Interaction"), then you can schedule the event, and modify this schedule, during Runtime on the
for Run-time
server.
In Runtime, the user has the flexibility to change all possible types and change the possibility to modes as
described in the dedicated chapter.
ACGM0195V1EN
HMWIN Studio User Manual
"Configuring the Schedule Interface
184

Advertisement

Table of Contents
loading

Table of Contents