Hangar 9 Composite QQ Yak-54 2.6m Instruction Manual page 46

Table of Contents

Advertisement

engine dome preparation For da-120 • • •
4
Using a drill and 1/16-inch drill bit, make a pilot hole. Then use 1/8-inch,
¼-inch and 5/16-inch drill bits respectively and enlarge the hole.
46
5
Insert blind nuts and using a 4.5mm ball driver along with the 1-inch standoff
needed for the engine installation, pull the blind nuts in the engine dome.
6
Mark the top of the engine dome for ignition module and ignition battery
installation by tracing the outside of the ignition box and battery.

Advertisement

Table of Contents
loading

Table of Contents