Eurocopter AS 350 83 Flight Manual page 175

Table of Contents

Advertisement

FLIGHT MANUAL
.For
carrying out a hoisting operation:
-Stabilize
the aircraft
in hover above the hoisting site
-Ensure
that sufficient
power reserve is available to permit moving off
in forward flight
once the load is hoisted on board
-Set
the jib in hoisting
position
-Ensure
that SLING (ELING) and FLARE (FUS.ECL) functions are not engaged.
-Engage the HOIST (TREUIL) pushbutton on the control console.
The hoist operator can now control the winch. To bring the load
into the cabin, unlock the jib and pivot it inwards.
The snap-hook can be used to hold the load while the hoist cable is being
unhooked.
Do not ~ve off in forward flight
until
the load is hoisted on board.
.
With "Air Equipement" hoist,
when rigid compact loads (over 80 kg -176
lb
post mod AMS 1587) are being hoisted,
inconsequential oscillations
may
-appear.
Operate the hoist.
~
: AIR EQUIPEMENT hoist
Dverheating of the winch motor must be avoided. Consequently
never exceed 6 consecutive hoisting
operations plus one
descent with maximum load, and maximum cable reel-ou1: or equivalen1:.
NQ!U
: 8REEZE hoi st
After each opera1:ion of the winch (lowering or raising)
wait 30
seconds. After 1:hree complete cycles (first
lowering with maximum
load;
the following
two lowerings with no load;
plus three
raisings at full
load) it is recommended to stop the winch for
forty minutes.
5 PERFORMANCE
With hoist jib folded,
the performance data laid down in Section 5.1 are
unaffected.
.
"
.
DGAC Approved:
35083
SUP.18
I A I B I C I F I
97-40
Page 3
~-

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Eurocopter AS 350 83

Table of Contents