Eurocopter AS 350 83 Flight Manual page 173

Table of Contents

Advertisement

FLIGHT MANUAL
.1~
The hoist installation
is designed to lower or haul on board people or
loads, while the aircraft
is hovering.
The aircraft
can be fitted
with either of the two electric
hoists:
BREEZE BL 16600 or AIR EQUIPEMENT
76370.
The hoist installation
comprises essentially:
-A
pivoting
jib (2) provided with a locking bolt (3), nK>unted on the
port side of the helicopter.
-An electrically
operated winch (1) fitted
with:
.a
33.5-metre (llO-ft)
cable in the case of the BREEZE hoist
.a
40-metre (130-ft)
cable in the case of the AIR EQUIPEMENT
hoist.
-A
snap hook nK>unted on a pulley-block
tackle (6).
.
-An electrical
control
system including:
.A cable jettison
guarded switch on the pilot's
collective
lever,
which
,
is used to sever the cable in an emergency.
-.A
rocker switch (7) on the hoist operator's
control grip, which is used
to raise,
lower and stop the cable.
The system is energized by means of a pushbutton on the control
console.
-Two cable guards (8) secured to the LH landing skid.
The hoist installation
is protected by :
.a
100-Amp fuse provided in the electrical
master box
.a
60-Amp fuse (4) provided on the aft wall near the hoist operator's
grip support. Both these fuses power the hoist.
two 2.5-Amp. fuses protecting
the "emergency release" circuit
.a 2.5-Amp. fuse protecting
the "up-down" circuit.
A mechanical cutter
provided on the rear wall allows the hoist operator
to sever the cable, if necessary.
I
,
7
.:/
4
5
0
0
6
~
.;
i
-d--~~d-
~
>
~
~---:::~~J
~
~-""'"
8
.
DGAC Approved:
350 B3
SUP.18
I A I B I c I F I
97-40
Page 1
I

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Eurocopter AS 350 83

Table of Contents