Dimensional Sketches; Installation Sequence - Windhager BioWIN Assembly Instructions Manual

Pellet central heating boiler
Hide thumbs Also See for BioWIN:
Table of Contents

Advertisement

2.
For the Installer

2.6 Dimensional sketches

All dimensions in mm:
Fig. 36 BioWIN pellet boiler 100–260 – Front view
KV ........ Boiler feed (1" tube)
KR ........ Boiler return (1" tube)
E .......... Discharge
A .......... Pellet feed (50 mm Ø pipe)
B .......... Reverse air flow (50 mm Ø pipe)
KT ........ Boiler temperature sensor
Z .......... Intake air for operating independently of the room air
1
Premium/Klassik types only
2
Exklusiv/Premium types only

2.7 Installation sequence

a) Transport boiler to installation site and remove crate see – section 2.8.
b) Fit reserve supply container cover (BioWIN Klassik only) – see section 2.9.
c) Fit cleaning lever (BioWIN Klassik and Premium only) – see section 2.10.
d) Install the exhaust pipe – see 2.11.
e) Fit cleaning tools – see section 2.12.
f) Fit feed unit on reserve supply container (BioWIN Premium and Exklusiv only) – see section 2.13.
g) Initial start-up and operating instructions – see section 2.14.
Fig. 37 BioWIN pellet boiler 100–260 – Side view
16

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents