Priority:
Status:
Stack Port Config
UNIT:
Stack Port:
Stack Port Group:
Stack Capability:
Status:

5.2 Application Example for Stack

Network Requirements
Establish a stack of ring topology with four T1700G-28TQ switches.
Network Diagram
Configuration Procedure
Configure switch A, B, C and D before physically connecting them:
Step Operation
1
Enable the stack port.
2
Configure unit number
Connect the switches:
Connect switch A, B, C and D as the network diagram shows, and then power the switches on to
establish a stack.
The priority for the stack member. The priority ranges from 1 to 15.
The new priority value takes effect immediately but does not affect
the current stack master. The new priority helps determine which
stack member is elected as the new stack master when the
current stack master or the switch stack resets.
Displays the state of the stack member.
Displays the stack ports' information of the selected unit.
Displays the stack port number.
Displays the group that the stack port belongs to. Stack feature
can only be enabled in one group at a time.
Enable/Disable the stack feature on this stack port.
Displays the state of the stack port.
Description
Required. On Stack→Stack Management→Stack Config
page, configure the stack port capability as "Enable".
Optional. On Stack→Stack Management→Stack Config
page, configure the new unit number of switch A, B, C and D
as 1, 2, 3 and 4 respectively, and then reboot them.