Brewer Assembly - Cafection TOTAL LITE Service And Installation Manual

Hide thumbs Also See for TOTAL LITE:
Table of Contents

Advertisement

SERVICE MANUAL FOR INNOVATION
9.2

Brewer Assembly

Preventive Maintenance (PM): Yearly or every 25,000 coffee cycles
The brewer is the heart of the equipment and is responsible for the taste of the beverage. It needs to
be replaced or refurbished to maintain the quality of the beverages served. We recommend having
your brewer assembly replaced every 25,000 coffee cycles.
Contact 1-800-561-6162 for parts and additional information.
Inspection
The following are signs of the vacuum is not functioning adequately and that your brewer may be due
for preventive maintenance:
·
if the seal is damaged;
·
if air gets into the cylinder and creates bubbles in the coffee;
·
if there are coffee grounds in the delivered product;
·
if the spent coffee grounds remain wet.
Teflon Seal
TOTAL LITE Revision 1
Screen and Seal
Cylinder
TOTAL LITE
Single-Cup Brewer
Brew
Chamber
59

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TOTAL LITE and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents

Save PDF