Trim Rod Adjustment - Yamaha Waverunner VXS VX1800 Service Manual

Table of Contents

Advertisement

1207B
2
3. Install the jet pump unit, and then tighten
the bolts "1" and "2" to the specified
torques.
4. Tighten the jet pump unit bolt "3".
2
LT
572
1
Jet pump unit bolt (M10 × 45 mm) "1"
40 Nm (4.0 kgf·m, 29.5 ft·lb)
Jet pump unit bolt (M8 × 18 mm) "2"
17 Nm (1.7 kgf·m, 12.5 ft·lb)
5. Connect the spout hose "1", and then tight-
en the clamp "2" to the specified torque.
6. Connect the bilge hose "3", and then fas-
ten it using the clamp.
7. Connect the trim rod joint "4" and shift rod
joint "5".
8. Connect the steering cable joint "6", and
then tighten the nut "7" to the specified
torque.
TIP:
Make sure that the steering and shifting oper-
ate correctly.
1
LT
572
4
1
5
3
Spout hose clamp "2"
2.5 Nm (0.25 kgf·m, 1.84 ft·lb)
Steering cable joint nut "7"
7 Nm (0.7 kgf·m, 5.2 ft·lb)
9. Initialize the RiDE system using the YDIS.
See "YDIS Instruction Manual".

Trim rod adjustment

1. Push the unlock button on the remote con-
trol transmitter so that power is supplied to
the ECM and the trim position is set to the
N position.
2. Disconnect the shift rod joint "1".
1
3. Disconnect the trim rod joints "1".
4. Loosen the locknut "2".
6-4
Jet pump unit
6
2
1
7

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Waverunner vxr vx1800a

Table of Contents