Injection Panel Chemical Solution Tank Installation Instructions - US Water Systems 385-GWU-1000 Owner's Manual

Green wave ultra iron, sulfur and manganese removal saltless water conditioning system
Table of Contents

Advertisement

Injection Panel Chemical Solution Tank Installation Instructions

1. Place the chemical solution tank close to the injection panel. Drill a 1/4" hole in the top of
the chemical tank. Push the 1/4" tubing in the hole in the tank.
2. Pull the 1/4" tubing from inside the tank up through the fill hole. Then push on the weighted
strainer on the 1/4" Tubing.
Installation, Operation and Maintenance Manual
385-GWU-1000, 385-GWU-1500, 385-GWU-2000
27

Advertisement

Table of Contents
loading

This manual is also suitable for:

385-gwu-2000385-gwu-1500

Table of Contents