Baxi Solo 2 60 RS Installation And Servicing Instructions page 27

Wall mounted room sealed gas fired central heating boilers
Table of Contents

Advertisement

Model
Input
kW
Maximum
11.00 37,500
30
Minimum
7.69
Maximum
14.65 50,000
40
Minimum
11.36 38,750
Maximum
18.32 62,500
50
Minimum
15.02 51,250
Maximum
21.98 75,000
60
Minimum
18.68 63,750
Setting Pressure
Btu/h
mbar
in wg
15.4 + 0.5
6.2 + 0.2
8.0 + 0.5
3.2 + 0.2
26,250
16.3 + 0.5
6.5 + 0.2
10.3 + 0.5
4.1 + 0.2
16.3 + 0.5
6.5 + 0.2
11.2 + 0.5
4.5 + 0.2
16.0 + 0.5
6.4 + 0.2
12.0 + 0.5
4.8 + 0.2
Turn on main electricity supply.
Light burner by turning thermostat knob to high
setting (fully clockwise).
Check pressure after 10 minutes. Adjust if necessary to
the relevant figures for the corresponding model shown
in the chart below.
To set the main burner pressure adjust the throttle as
shown. To increase the burner pressure, turn the
adjustment screw in either direction until the required
pressure is obtained.
Set any timer control, room thermostats etc to the
customer's specific requirements.
Turn the boiler thermostat knob to the OFF
position marked O. Screw home the pressure
test point screw. Turn the boiler thermostat knob
to the required setting. Make a final check for gas
soundness of all gas carrying joints on boiler.
Check operation of flame failure device. Turn gas
control knob clockwise in the direction marked O. The
control knob cannot be depressed until ignition restart
interlock device in gas valve has disengaged. This
takes 60 seconds approximately. Pilot must not be relit
for 3 minutes after shut down.
The appliance is fitted with a pump overrun timer which
keeps the pump running (fully pumped systems only),
when any external control switches the appliance off.
To check the operation of this, turn programmer,time
switch off, the pump should continue to run for
approximately 3 minutes and then stop.
The boiler and system should be run and then flushed
and treated in accordance with BS7593: 1992 and the
flushing agent/inhibitor manufacturers instructions.
When all the air has been removed from the water
circuit, the pump and radiators should be balanced to
achieve the design temperature drop across the
system. Recheck for water leaks.
Carefully read and complete all sections of the
"Benchmark" Installation, Commissioning and Service
Record Log Book that are relevant to the appliance and
installation. The details of the Log Book will be required
in the event of any warranty work. The Log Book must
be handed to the user for safe keeping and each
subsequent regular service visit recorded.
27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Solo 2 50 rsSolo 2 40 rsSolo 2 30 rs

Table of Contents