Commissioning steps
1.)
Gas type
2.)
Gas supply pressure checked?
3.)
Gas soundness test carried out?
4.)
Balanced flue system checked?
5.)
Water connections checked for leaks?
6.)
Fill the siphon
7.)
Vented boiler and system?
8.)
System pressure 1.5 - 2.5 bar?
9.)
Entered type of gas and output onto label?
10.)
Function test carried out?
11.)
Flue gas test:
Gross flue gas temperature
Ventilation air temperature
Net flue gas temperature
Carbon dioxide content (CO
Carbon monoxide content (CO)
12.)
Casing fitted?
13.)
System user trained, tech. docs. handed over?
14.)
Confirm commissioning?
34
Commissioning report
) or oxygen content (O
)
2
2
Test values or confirmation
Natural gas H
LPG
Wobbe index
Net calorific value
kWh/m³
kWh/m³
t
[°C]
A
t
[°C]
L
(t
- t
) [°C]
A
L
%
ppm
3061344_201509