Commissioning CGU-2(K) / CGG-2(K)
1)
Gas type
2)
Calculated flue length
3)
Gas supply pressure checked?
4)
Nozzle pressures checked?
(only complete when changing the gas type):
5)
Gas leak test carried out?
6)
Balanced flue system,
tightness of condensate trap (optional), checked?
7)
Water connections checked for leaks?
Boiler and system vented?
8)
System pressure 1.5 - 2.5 bar?
9)
Function test carried out?
10)
Casing fitted?
11)
12)
System user trained, tech. docs. handed over?
13)
Confirm commissioning?
Company / Name
Date / Signature
50

Commissioning report

Natural gas H
LPG
Wobbe Index_____________________kWh/m³
Net calorific value_________________kWh/m³
_______________________________________ m
No.____________________ /_______________ mm
______________________________________ mbar
________________________________________
______________ / _________________________
Actual value or confirmation