Commissioning Report - Wolf CGS-2-14/120L Installation Instructions Manual

Hide thumbs Also See for CGS-2-14/120L:
Table of Contents

Advertisement

Commissioning steps
1.) Serial number on the type plate
2.) Electrical wiring/connection/fuse protection checked in
accordance with specification from installation instructions
and VDE regulations?
2.) System flushed?
3.) System filled and water treatment carried out in accordance
with "Technical information, water treatment"?
pH value set
Total hardness set
4.) Appliance and system vented?
5.) System pressure 2.0 - 2.5 bar?
6.) Water connections checked for tightness?
7.) Trap filled?
8.) Gas valve set to gas type?
9.) Gas supply pressure checked?
10.) Gas tightness test carried out?
11.) Switch heating appliance ON, set control unit to OFF/
Standby.
12.) Standard setting set on control unit?
3064816_201804
34. Commissioning report
Test values or confirmation
___________________________________
________________ pH value
________________
Natural gas
LPG
Wobbe index
_____________ kWh/m³
Net calorific value _____________ kWh/m³
°dH
67