3-Stage-Pump - Wolf CGB-11 Installation Instructions Manual

Gas fired condensing boilers
Hide thumbs Also See for CGB-11:
Table of Contents

Advertisement

Residual height of the three-stage pump
Solution
3061344_201509

3-stage-pump






































Problem
Individual radiators are not getting
properly warm. i.e. reduced
During spring and autumn, the required
room temperature is not reached.
Selected room temp. is not reached
when outside temperatures are very low.
 
 









Flow rate in l/h
Solution
Create hydraulic balancing,
flow rate of hotter radiators.
Increase set room temperature
at controller, e.g. from 20 to 25 °C.
Select a steeper heating curve
at the controller, e.g. from 1.0 to 1.2.
 
 
 
 


         
53

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cgb-k-24Cgb-24Cgb-20Cgb-k-20

Table of Contents