Commissioning Report - Wolf MGK-2-390 Installation Instructions Manual

Gas condensing boilers
Table of Contents

Advertisement

Commissioning steps
1.) Gas type
2.) Gas supply pressure checked?
3.) Gas leak test carried out?
4.) Balanced flue system checked?
5.) Water connections checked for leaks?
6.) Siphon filled?
7.) System flushed?
8.) System filled and water treatment carried out in line with
"Design information, water treatment"?
pH value set
Total hardness set
9.) No chemical additives (inhibitors, antifreeze) added?
10.) Boiler and system vented?
11.) System pressure 1.5 - 2.5 bar?
12.) Gas type and output entered on label?
13.) Function test carried out?
14.) Flue gas test
Gross flue gas temperature
Ventilation air temperature
Net flue gas temperature
Carbon dioxide content (CO
Carbon monoxide content (CO)
15.) Casing fitted?
16.) System user trained, documentation handed over?
17.) Commissioning confirmed?
3063772_201507

32. Commissioning report

) or oxygen content (O
2
2
Test values or confirmation
Natural gas E/H
Natural gas LL
Wobbe index
Calorific value, heating _________ kWh/m³
_____________
_____________
_____________
)
_____________
_____________
_____________
_____________ kWh/m³
________________ pH value
________________
t
A
t
A
(t
- t
) [°C]
A
L
57
°dH
[°C]
[°C]
%
ppm

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mgk-2-550Mgk-2-470Mgk-2-630

Table of Contents