Wolf CGB-11 Installation Instructions Manual page 64

Gas fired condensing boilers
Hide thumbs Also See for CGB-11:
Table of Contents

Advertisement

Horizontal concentric balanced flue C13x, C83x and B33
and flue on an external wall C53x (examples) DN 80/125
1 Gas fired condensing boiler
2 Adaptor from DN60/100
to DN80/125
3 Balanced flue incl. inspection
aperture DN80/125
(250 mm long)
4 Balanced flue DN80/125
500 mm
1000 mm
2000 mm
5 Spacer clip
10 Inspection elbow 87° DN80/125
11 Bend 87° DN80/125
15 Balanced flue
horizontal, incl cowl
16 Rose
17 External wall panel 87° DN80/125
with smooth air pipe end
18 Balanced flue pipe, external wall
DN80/125
19 LAir inlet piece, external wall
DN80/125
20 conc. terminal end
with clamping strap
21 Connection to a
flue gas chimney B33
Length 250 mm with air apertures
22 Support rail
23 Support bend 87° DN80
24 Spacers
25 PP flue DN80
26 Duct cover with
UV-stabilised terminal
28 Inspection tee
29 Air pipe Ø 125 mm
30 Air inlet pipe Ø 125 mm
64
Design information
4
11
Horizontal balanced flue routing
through a pitched roof
10
3
2
2
1
1
C53x
C13 x
16
16
30
Install the horizontal flue with approx. 3° slope (6 cm/m) towards the boiler. Route the
horizontal air supply with a 3° slope towards the outside – install the air inlet with wind
protection; permissible wind pressure at the air inlet 90 Pa. The burner will not operate
with higher wind pressure. Inside the duct downstream of the support bend (23), the flue
can be routed in DN 80. A flexible flue DN 83 can be connected downstream of the support
bend (23).
Dormer
220
5
15
16
4
5
4
Flue on an external wall
4
10
(where required)
2
90 mm Ø opening in
1
the chimney side. Install
the flue airtight into the
B33
chimney side.
5
29
28
4
2
1
C83 x
20
20
18
18
19
18
18
16
16
17
17
5
21
16
5
4
16
3061344_201509
26
25
24
23
22
26
25
24
23
22

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cgb-k-24Cgb-24Cgb-20Cgb-k-20

Table of Contents