For concentric air/flue pipes (balanced flue systems),
NB
use only original Wolf components.
Please observe the technical information regarding
balanced flue systems prior to installing the flue pipe
or the ventilation air connection.
Different countries have different regulations. We
would therefore recommend you contact the appro-
priate authorities to check local requirements.
I n t i g h t s p a c e s , C O
2
rature can be tested immediately downstream of the
boiler at a connection adaptor with inspection piece
(80/125 system) or alternatively at an inspection piece with
connector (60/100 system).
The flue gas test ports must remain accessible to
NB
the relevant authorities, even after fitting the ceiling
bezels.
18

Installation of a balanced flue system

v a l u e a n d f l u e g a s t e m p e -
Fig.: Example: Balanced flue system