Filling the siphon
- Remove the siphon.
- Fill the siphon with water.
- Install the siphon.
Checking the gas supply pressure
• Switch OFF the ON/OFF switch. Close the gas shut-off
valve.
• Remove the differential pressure gauge, and reseal the
test port with its plug .
• Open the gas shut-off valve.
• Check the test nipple for gas leaks.
• Complete the enclosed notice and affix to the inside of the
casing.
• Close the boiler.