Wolf CGB-11 Installation Instructions Manual page 38

Gas fired condensing boilers
Hide thumbs Also See for CGB-11:
Table of Contents

Advertisement

- Pivot the control unit lid down.
Switch OFF the boiler at the ON/OFF switch.
The mains terminals are ‚live' even when the ON/
OFF switch has been switched OFF.
- Disconnect the system from the power supply.
Close the gas shut-off valve.
- Unlock the casing lid with the l.h. and r.h. rotating locks.
Release the lower part of the casing lid and unhook at the
top.
38
Maintenance
rotating lock
3061344_201509

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cgb-k-24Cgb-24Cgb-20Cgb-k-20

Table of Contents