Commissioning steps
1.) Gas type
2.) Gas supply pressure checked?
3.) Gas leak test carried out?
4.) Balanced flue system checked?
5.) Water connections checked for leaks?
6.) Siphon filled?
7.) Has the system been filled in acc. with the technical
information regarding water treatment?
8.) Boiler and system vented?
9.) System pressure 1.5 - 2.5 bar?
10.) Entered gas type and output onto label?
11.) Function test carried out?
12.) Flue gas test
Gross flue gas temperature
Inlet air temperature
Net flue gas temperature
Carbon dioxide content (CO
Carbon monoxide content (CO)
13.) Casing fitted?
14.) System user trained, documentation handed over?
15.) Confirm commissioning?
3062880_0910

Commissioning report

) or oxygen content (O
2
2
Test value or confirmation
Natural gas H
LPG
Wobbe index ___________ kWh/m³
Calorific value, heating ___________ kWh/m³
)
_____________
_____________
_____________ (t
- t
A
_____________
_____________
_____________
t
[°C]
A
t
[°C]
A
) [°C]
L
%
ppm
31