Installation - Wolf CGB-11 Installation Instructions Manual

Gas fired condensing boilers
Hide thumbs Also See for CGB-11:
Table of Contents

Advertisement

Supply line – subsurface version
You may determine the connections for cold water and DHW,
for the central heating and gas supply pipe and safety valve
drain using the subsurface installation template, if these ser-
vices are laid under the surface.
Route the supply lines for gas, central heating and DHW
underneath the surface in accordance with the enclosed
installation template.
You may determine the connections for cold water and DHW,
for the central heating and gas supply pipe(s) and safety valve
drain using the panel for unfinished walls (accessories), if these
services are laid under the surface.
Solder the elbows of the panel for unfinished walls to the
supply lines. (Each of the elbows can be turned 360° for easy
connection of the supply lines from any direction).
Fit the installation accessories.
Supply line – surface mounted version
You may determine the connections for cold water and DHW,
for the central heating and gas supply pipe(s) and safety valve
drain using the panel for finished walls (accessories), if these
services are routed above the surface.
Fit the installation accessories for the gas fired combi boiler
and connect the supply lines as surface mounted version.
14

Installation

Fig.: Subsurface installation template
Fig.: Panel for mounting on unfinished walls (accessories)
for: CGB-K, CGB with FSW-120
Fig.: Panel for mounting on unfinished walls (accessories)
Fig.: Connection panel for surface mounted version (acces-
sories) for: Gas fired boilers CGB
Fig.: Connection panel for surface mounted version (acces-
sories) for: Gas fired combi boilers CGB-K
3061344_201509

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cgb-k-24Cgb-24Cgb-20Cgb-k-20

Table of Contents