Wolf CGB-11 Installation Instructions Manual page 59

Gas fired condensing boilers
Hide thumbs Also See for CGB-11:
Table of Contents

Advertisement

Vertical balanced flue routing (examples) system DN60/100
6
7
1 Gas fired condensing boiler
2 Balanced flue incl.
inspection aperture
(250 mm long)
3 Separator DN60/100
(slide coupling)
if required
4 Balanced flue DN60/100
500 mm
1000 mm
2000 mm
5 Balanced flue, vertical
DN60/100
(roof outlet for flat or pitched roofs)
L = 1200 mm
L = 1200 mm ... 1700 mm
6 Universal tile for
pitched roof 25/450
7 Flat roof collar
8 Bend 45° DN60/100
9 Inspection elbow DN60/100
10 Bend 87° DN60/100
11 Rose
12 Support rail
13 Support bend 87° DN60 to DN80
14 Spacers
15 Flue DN80
500 mm
1000 mm
2000 mm
16 Duct cover with
UV-stabilised terminal
17 Spacer clip
3061344_201509
Design information
5
4
3
2
1
C33x
Sample installation for balanced flue con-
nection options (vertical)
NB
Install the
horizontal line
with > 3° slope
towards the
boiler
5
4
3
8
8
1
1
C33x
C33x
9
4
3
1
C93x
Flue gas < 120 °C
5
4
3
9
4
10
17
4
11
16
15
14
13
12
59

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cgb-k-24Cgb-24Cgb-20Cgb-k-20

Table of Contents