3. Physical installation
Image 3-5
Exhaust system
Ensure good condition of the lamp house blower. Keep the blower inlet clean for unrestricted air flow.
To ensure maximum lamp life, operate the lamp house blower and the exhaust system for at least ten minutes
after extinguishing the lamp.
3.3
Connecting the projector with the power net
W
ARNING
ble disconnect switch, circuit breakers and ground fault current interrupters. The installation shall be done
according to the local electrical installation codes.
C
AUTION
minal strip located in a sealed compartment behind the rear cover of the projector.
C
AUTION
or AWG 10
Necessary tools
•
Flat screw driver.
•
Phillips screw driver PH2.
16
:
The total electrical installation should be protected by an appropriate rated and readily accessi-
:
ALL POWER CONNECTIONS to the DP2K C-series projector projector are made to the three-ter-
:
The cross-sectional area of the conductors in the Power Supply Cord shall be not less than 4 mm
R5905050 DP2K C-SERIES 10/07/2012
2