Refrigerant Cycle Diagram - Toshiba RAS-M10PKVP-E Service Manual

Air conditioner (split type)
Hide thumbs Also See for RAS-M10PKVP-E:
Table of Contents

Advertisement

RAS-M10PKVP-E, RAS-M13PKVP-E, RAS-M16PKVP-E, RAS-M18PKVP-E / RAS-4M27UAV-E
1500cc
NOTE:
NOTES:
• You need not add refrigerant if the piping length is 40 m or less.
• If the length exceeds 41 m, add 20 g of refrigerant per 1 meter over.
• Connection of only one indoor unit is unavailable. Two or more indoor units should be connected.

7. Refrigerant Cycle Diagram

– 45 –
DA220A2F-22L
NOTE :
Gas leak check position
Refrigerant flow (Cooling)
Refrigerant flow (Heating)
3m
70m
2,40kg