Toshiba RAS-M10PKVP-E Service Manual page 140

Air conditioner (split type)
Hide thumbs Also See for RAS-M10PKVP-E:
Table of Contents

Advertisement

No. Part name
8
Fan motor
1) Perform works of Detachment 1 of 1 and 2.
2) Take off flange nut which fixes the fan motor and the
propeller fan.
∗ The flange nut is loosened by turning it clockwise.
(To tighten the flange nut, turn it counterclockwise.)
3) Remove the propeller fan.
4) Remove the relay connector for fan motor from the inverter.
5) Remove the fan motor lead from the fan motor lead fixing
rubber of the penetrating part of the partition plate.
6) Take off the fixing screws (4 pcs. each) while supporting the
fan motor so that it does not fall.
∗ Caution to assembly of fan motor
• Tighten the flange nut with 4.95N•m (50 kgf•cm).
• Adjust length of the fan motor lead fixing rubber so that
the slackened fan motor lead does not come to contact
with the propeller fan.
Put in the fan motor lead fixing rubber to the partition
plate so that the projection comes to the refrigerating
cycle side.
• There provided at 2 positions the grooves to pass
the fan motor lead wire into the motor base. Use
the lower groove.
Motor base
Detail A
Detail A
Detail A
CAUTION
Using the metal band of the motor base, be sure to fix the fan
motor lead to the motor base so that the fan motor lead does
not come to contact with the propeller fan.
Procedure
Detail A
Lower groove
Lower groove
Lower groove
– 140 –
Remarks
Propeller fan
Loosened by
Loosened by
Loosened by
turning clockwise
turning clockwise
turning clockwise
Flange nut
Flange nut
Flange nut
Propeller fan
Fan motor
Fan motor
Fan motor
Fan motor relay connector
Fan motor lead fixing rubber
Projection/Refrigerating
Projection/Refrigerating
Projection/Refrigerating
cycle side
cycle side
cycle side
Fan motor

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ras-m16pkvp-eRas-m18pkvp-eRas-4m27uav-eRas-m13pkvp-e

Table of Contents