9. Insert the CIS to the DP.
* Pass the flexible flat cable through between
the roller and the frame as shown in the fig-
ure.
10. Connect other end of the flexible flat cable
to the CIS SHD PWB.
11. Insert the flexible flat cable between CIS
SHD PWB and guide.
12. Refit CIS using two screws, adjusting to the
installed position of the graduation of the
retainer.
13. Connect the connector.
14. Refit the DP front cover and original switch-
back guide to DP.
Y104350-7
Flexible flat cable
Sevice Manual
Figure 1-6-176
Flexible
flat cable
CIS SHD PWB
Figure 1-6-177
Flexible flat cable
Figure 1-6-178
Flexible flat cable
Guide
CIS SHD PWB
1-6-89