Installing the AC PS unit
To install the T2150 series AC PS unit, follow the steps below and refer to figure 4-18.
1.
Seat the LED cover/power switch frame on the system unit (figure 4-18).
2.
Secure three M2.5x8 silver screws on the LED cover/power switch frame
(figure 4-18).
3.
Seat the AC PS unit with AC power socket on the system unit and connect the
power supply cable to PJ501 on the system board (figure 4-18).
4.
Secure one M2.5x10 screw on the AC PS unit (figure 4-18).
5.
Install the battery pack, optional PCMCIA card, optional memory module, key-
board, hard disk drive, top cover, and display assembly as described in sections 4.7
back through 4.2.
T2150 Series
4-23