15) Affix the LED label so that it fits the edge of the Right Rear Cover 1.
CheckingOperationAfterInstallation
1)Insertthepowerplugintothesocketandturnonthemainpowerofthehostmachine.
2)Makeasettingofmirroring.
•
Specify"1"under"ServiceMode>COPIER>OPTION>FNCSW>W/RAID".
3)TurnOFF/ONthemainpowerofthehostmachinetoenablethesettingvalue.
4)MakesurethattheUIscreenisactivatedcorrectly.
5)MakesurethattheLEDblinks.
•
HDD1(Slot1):ThegreenLEDblinks.
•
HDD2(Slot2):ThegreenandredLEDsblink.
CAUTION:
Rebuildprocessstartsaftersetting"1"forW/RAID.IfanerroroccursduringtherebuildprocessattheinitialinstallationTheharddiskneedstobereplaced.(Callservicerep.),reexecutethe
processwiththefollowingprocedure.
1)CheckthatthelightingredLEDisHDD2.
2)SelectServiceMode>COPIER>OPTION>FNCSW>W/RAID,andset"0".
3)Toenablethesettingvalue,turnOFF/ONtheMainPowerSupplySwitchofthehostmachine.
4)SelectServiceMode>COPIER>OPTION>FNCSW>W/RAID,andset"1".
5)Toenablethesettingvalue,turnOFF/ONtheMainPowerSupplySwitchofthehostmachine.
Theforegoingprocedureislimitedtotherebuildprocessattheinitialinstallation.
Anerrorduringtherebuildprocessthatisexecutedduringoperationisnotincludedintheconsideration.
9
LED Label
Right Rear Cover 1
9
16)ClosetheRightRearCover1,RightLower
Cover,andRightUpperCover.
F-9-183
9-96
9-96