6.18 Function Tests; 1Checking The Ionisation Current; (Flame Current) - Buderus Logano plus GB312 Installation And Maintenance Instructions Manual

Gas condensing boiler
Table of Contents

Advertisement

6
Commissioning

6.18 Function tests

During commissioning and the annual inspection, check
all regulating, control and safety equipment for correct
function and, where applicable, for correct settings.
6.18.1 Checking the ionisation current

(flame current)

Call up the service level of RC35 programming unit
B Open the flap on the RC35 programming unit.
B Press
+
+
SERVICE MENU.
B Turn rotary selector
diagnosis is selected (highlighted with
B Press
to open menu SERVICE/DIAGNOSIS.
B Turn rotary selector
diagnosis is selected (highlighted with
B Press
to open menu SERVICE/DIAGNOSIS.
The menu items shown will vary depending
on the heating system.
B Hold down
and turn rotary selector
simultaneously to change the setting, e.g. flame
current.
The change takes effect when you release the key.
B Read off the ionisation current and enter it in the
commissioning report (
To ensure fault-free operation, the ionisation current at
partial and full load (with a burning flame) should be at
least 3 μA.
B Return to the operating mode at the RC35
programming unit.
B Close the flap on the RC35 programming unit.
38
simultaneously to open menu
anti-clockwise until
).
anti-clockwise, until
).
Chapter 6.23, page 41).
Logano plus GB312 - Subject to technical modifications.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents