Function Tests; Checking The Ionisation Current (Flame Current); Checking For Leaks During Operation; Fitting Sections Of The Casing - Buderus Logano plus GB402 Installation And Maintenance Instructions Manual

Floor standing gas condensing boiler
Table of Contents

Advertisement

7.14 Function tests

During commissioning and the annual inspection, check all regulating,
control and safety equipment for correct function and, where
applicable, for correct settings.

7.14.1 Checking the ionisation current (flame current)

Accessing the service level on the RC35
▶ Open flap on RC35.
▶ Press
+
+
simultaneously to open the SERVICE
MENU menu.
▶ Turn rotary selector
anticlockwise until diagnosis is selected
(marked with
).
SERVICE MENU
quick operation
settings
B
diagnosis
servicing
▶ Press
to open the SERVICE/DIAGNOSIS menu.
▶ Turn rotary selector
anticlockwise until diagnosis is selected
(marked with
).
▶ Press
to open the SERVICE/DIAGNOSIS menu.
The menu items shown will vary depending on the
heating system.
▶ Hold down
and turn rotary selector
change the setting, e.g. flame current.
The change takes effect when you release the key.
▶ Read off the ionisation current and enter it in the commissioning
report ( Chapter 7.18, page 28).
To ensure fault-free operation, the ionisation current at partial and full
load (with a burning flame) should be at least 15 μA.
▶ Return to operating mode on the RC35.
▶ Close the flap on the RC35.

7.15 Checking for leaks during operation

▶ With the burner operational, use a foaming agent to test all sealed
points in the entire burner gas train, such as:
• Test nipple
• Plug for gas supply pressure
• Fittings (also at the gas connection) etc.
The agent must be approved for gas tightness testing.
DANGER: Risk of system damage due to short circuit!
▶ Cover the areas at risk before performing a tightness
test, e.g. the internal water pressure sensor and the
return sensor on the boiler return.
▶ Never spray leak detection agent onto cable entries,
plugs or electrical cables. Do not allow it to drip onto
them either.
▶ To prevent corrosion, carefully wipe off the leak
detection agent afterwards.
Logano plus GB402 – 6 720 804 428 (2012/09)

7.16 Fitting sections of the casing

▶ Hook in the rear side panels first at the bottom (excluding insulation)
▶ Using locking screws, secure the rear side panels to the boiler back
▶ Hook in the front side panels first at the bottom (including insulation)
▶ Using locking screws, secure the front side panels at the front [2] of
▶ First hook in the bottom of the front panel [1], then raise slightly and
▶ With locking screws, secure the top of the front panel [1] to the boiler.
▶ Affix the clear pocket containing the technical documentation in a
simultaneously to
Fig. 37 Fitting sections of the casing
[1]
[2]
[3]
7.17 Informing the owner/operator and handing over
▶ Familiarise the owner/operator with the entire heating system and the
▶ Together with the owner/operator, carry out a shutdown and restart.
▶ Explain to the customer what to do in an emergency, e.g. a fire,
▶ Hand over the technical documentation to the owner/operator, and
[3], then raise slightly and hook in at the top.
panel [3].
[2], then raise slightly and hook in at the top.
the boiler.
hook in at the top.
clearly visible spot on the side of the boiler.
Front panel
Front side panels (incl. thermal insulation)
Rear side panels (excl. thermal insulation)
technical documentation
operating instructions for the boiler.
referring to the operating instructions.
both sign the commissioning report ( Chapter 7.18, page 28).
Commissioning
7
27

Advertisement

Table of Contents
loading

Table of Contents