Honeywell HC900 Installation And User Manual page 251

Process controller
Hide thumbs Also See for HC900:
Table of Contents

Advertisement

Appendix - Installation of Remote Termination Panels (RTPs) - Analog Input/Digital Input/Digital Output/Analog
Output
32 Point DC Digital Output
Step
4
Connect field wiring.
RTP A for
outputs 1 to 16
RTP B for outputs
17 to 32
Note: SDC- refers to the switched negative side of the DC supply.
Note: Terminals 9 and 11 (DC-) are connected through the RTP cable. Same for terminals 10 and 12 (DC+).
Revision 19
06/14
1
1
2
2
3
3
4
4
21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
DC Supply
DC Supply
1
2
3
21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
DC Supply
HC900 Process Controller Installation and User Guide
Action
5
5
6
6
7
7
8
8
9 10 11 12 13 14 15 16 17 18 19 20
9 10 11 12 13 14 15 16 17 18 19 20
Install jumper wire
Install jumper wire
4
5
6
7
8
9 10 11 12 13 14 15 16 17 18 19 20
Install jumper wire
239

Advertisement

Table of Contents
loading

Table of Contents