Appendix - Installation of Remote Termination Panels (RTPs) - Analog Input

Analog Input

8 Point Analog Input
Step
1
ATTENTION: RTP is not for use with thermocouples.
ATTENTION: RTP and cables are intended for permanent installation within their own enclosure.
Mount RTP cable assembly to HC900 Controller (Figure 92).
Remove appropriate key tabs from terminal block to allow mating with the module. See page 75.
Connect desired cable to AI module at controller. Choose from:
900RTC-L010
900RTC-L025
900RTC-L050
Install AI module label onto the module connector cover.
Connect shield drain wire to the grounding bars at the base of the HC900 rack. All field-wiring
shields must be grounded as described in the shield grounding section (page 70).
2
Mount RTP to DIN rail.
Latch to rail. See page 244.
Connect cable to RTP.
208
Remote Terminal Low Voltage Cable Assembly, 1.0 meters long
Remote Terminal Low Voltage Cable Assembly, 2.5 meters long.
Remote Terminal Low Voltage Cable Assembly, 5.0 meters long
HC900 Process Controller Installation and User Guide
Action
Revision 19
06/14