Completing The Installation - IBM eServer xSeries 235 Type 8671 Option Installation Manual

Hide thumbs Also See for eServer xSeries 235 Type 8671:
Table of Contents

Advertisement

10. Reinstall the adapters and plastic dividers that you removed, and close the
11. Reinstall the server cover (see "Installing the server bezel and left-side cover
12. Start the Configuration/Setup Utility program and set configuration parameters

Completing the installation

To complete your installation, you must reinstall the bezel, reinstall the server cover,
reconnect all the cables that you disconnected earlier and, for certain options, run
the Configuration/Setup Utility program. Follow the instructions in this section.
Attention:
v For proper cooling and airflow, replace the server cover before or shortly after
v To ensure proper server operation, do not remove the air-baffle assembly from
Note: If you have just plugged the power cords of your server into electrical outlets,
adapter-retention bracket; then, reconnect the internal cables that you
disconnected.
(tower model)" on page 62 or "Installing the server bezel and top cover (rack
configuration)" on page 65).
Note: You must wait approximately 20 seconds after you plug the power cord
of your server into an electrical outlet before the power-control button
becomes active.
as needed. See the User's Guide on the IBM xSeries Documentation CD.
turning on the server. Operating the server for extended periods of time (over 30
minutes) with the server cover removed might damage server components.
the server except when installing or removing the components that are under the
air-baffle cover.
you will have to wait approximately 20 seconds before pressing the
power-control button.
Chapter 2. Installing options
61

Advertisement

Table of Contents
loading

Table of Contents