10. Turn on the blade server.
11. Start the blade server Configuration/Setup Utility program and set configuration

Completing the installation

To complete the installation, perform the following tasks. Instructions for each task
are in the following sections.
1. Reinstall the blade server bezel assembly if you removed it.
2. Close the blade server cover (unless you installed the SCSI storage expansion
d. Ensure that the battery clip is touching the base of the battery socket by
pressing gently on the clip.
7. Insert the new battery:
a. Tilt the battery so that you can insert it into the socket, under the battery
clip.
b. As you slide it under the battery clip, press the battery down into the
socket.
8. Close the blade server cover (see "Closing the blade server cover" on
page 32).
Statement 21:
CAUTION:
Hazardous energy is present when the blade is connected to the power
source. Always replace the blade cover before installing the blade.
9. Reinsert the blade server into the bay in the BladeCenter unit.
parameters as needed. See "Using the Configuration/Setup Utility program" on
page 40 for information.
unit option).
Statement 21: