Checking Indication Accuracy - Omron E5AK User Manual

E5ak series digital controller
Hide thumbs Also See for E5AK:
Table of Contents

Advertisement

CHAPTER 7 CALIBRATION

7.6 Checking Indication Accuracy

F Thermocouple
AC100-240V
(AC/DC24V
SOURCE
F Platinum resis-
tance thermome-
ter
7--12
· After calibrating input, make sure that you check indication accuracy to
make sure that the E5AK controller has been correctly calibrated.
· Operate the E5AK controller in the PV/SP monitor (level 0 mode) mode.
· Check the indication accuracy at the upper and lower limits and mid-
point.
· Preparation
The following figure shows the required device connection. Make sure
that the E5AK controller and cold junction compensator are connected
by a compensating conductor for the input type that is to be used during
actual operation.
~
)
10
30
31 32
9
29
8
28
7
27
6
26
5
25
4
24
3
23
2
22
33
1
21
· Operation
Make sure that the cold junction compensator is at 0_C, and set STV out-
put to the voltage equivalent to the starting power of the check value.
· Preparation
The following figure shows the required device connection.
~
AC100-240V
(AC/DC24V
)
SOURCE
· Operation
Set the 6-dial to the resistance equivalent to the check value.
20
19
18
17
16
15
14
13
12
11
Compensation
conductor
10
30
31 32
9
29
8
28
7
27
6
26
5
25
4
24
3
23
2
22
33
1
21
Cold junction
compensator
20
19
18
17
16
15
14
13
6-dial
12
11
STV

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents