Motor Mounting - Central Machinery 67595 Set Up And Operating Instructions Manual

14” four speed woodworking bandsaw
Table of Contents

Advertisement

Figure For Step 3-4
depth
gauge
ShaFt
4.
Hold the Pulley in place and insert the
depth gauge you made in step 4-2 (Bolt
(G) and Nut (N)) into the key slot, push-
ing the key into position. The depth
gauge can now be disassembled and
placed with the other hardware.
5.
While holding the Pulley in place, tighten
the Set Screw (10D) in the side of the
Pulley to secure it to the shaft. The Pul-
ley no longer needs to be held in place.

Motor Mounting

6.
Have an assistant hold the Motor (11A)
in place while it is attached to the Motor
Plate (10A).
SKU 67595
(cutaway view.)
For technical questions, please call 1-800-444-3353.
Figure For Step 3-7
pulleYS
Should
line up.
7.
There are two sets of slots on the Motor
Plate (10A). Line the Motor Pulley (3D)
up with the Pulley (1D) above it.
8.
Insert a Bolt (D) and Washer (H) through
each hole from one side, and secure the
Bolt with a Washer (H), Lock Washer (J),
and Nut (K). Leave the Nuts snug, but
do not tighten them completely yet.
9.
Remove the nylon cable tie that secured
the Power Cord (14A) during shipment.
10a
11a
Page 13

Advertisement

Table of Contents
loading

Table of Contents