Cub Cadet 8354 Service Manual page 52

Hide thumbs Also See for 8354:
Table of Contents

Advertisement

CHAPTER 2
8354/8404
C. COOLING SYSTEM
a . Thermostat
Valve opening temperature at beginning
Opened completely (height 8 mm 0.315 in.)
b. Radiator
Radiator tightness
Radiator cap tightness
Fan belt tension
[deflection at 98 N (10 kgf, 22 lbs) of force]
D. FUEL SYSTEM
a . Inject Pump
Injection timing (BTDC)
b. Injection Nozzle
Fuel injection pressure
Fuel tightness of nozzle valve seat
NOTE:
Injection Sequence Four Cylinders: 1 → 3 → 4 → 2
Three Cylinders: 1 → 2 → 3
(The cylinder number is given in order from the
gear case end.)
2-30
K&T Saw Shop 606-678-9623 or 606-561-4983
www.mymowerparts.com
No leak at 137 kPa, 1.4 kgf/cm
69.5 ~ 72.5 °C (157.1 ~ 162.5 °F)
85 °C (185 °F)
10 seconds or more for pressure
falling from 88 ~ 59 kPa
from 0.9 ~ 0.6 kgf/cm
2
from 13 ~ 9 psi
7 ~ 9 mm
0.28 ~ 0.35 in.
18°
13.73 ~ 14.715 MPa
2
140 ~ 150 kgf/cm
1,991 ~ 2,134 psi
No fuel leak for 5 sec.
at pressure
12.74 MPa
130 kgf/cm
2
1,849 psi
D615-W02 May-2003
2
, 20 psi

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

8404

Table of Contents