Installing Options and Accessories
6. Install conduit between the UPS and RIM. See Appendix A for UPS cabinet and RIM
7. Install wiring between the UPS and RIM. See Drawing 164201535-8 starting on
NOTE
or the customer.
8. Install 120 Vac power wiring from the critical bus to the RMP. See Drawing
NOTE
Powerware Customer Service Engineer. Contact service to schedule a date.
9. Contact your Powerware service representative for verification and testing of the
Table 6-2. J1 through J4 Interface Connectors
UPS AVAILABLE
UPS OFFLINE
BATTERY WEAK
UTILITY FAILURE
6-6
wiring access information.
page A-33 for Hot Sync CAN Bridge Card and RIM location, terminal location, and
wiring information.
120 Vac for the RIM should be supplied from the critical bus by facility planners
164201535-8 starting on page A-33 for terminal location and wiring information.
Setup of the Hot Sync CAN Bridge Card must be performed by an authorized
RIM and its connections prior to making connections with J1 through J4 (see
Table 6-2 and Drawing 164201535-12).
You can order interface cables separately for connecting to the 15-Pin D-Sub
Connectors.
Status
J1 through J4
Pins 1 and 12
Pins 3 and 13
Pins 5 and 14
Pins 6 and 15
Powerware
9390 UPS (40–80 kVA) Installation and Operation Manual S 164201535 Rev C
®
Description
Contacts are closed when the UPS is offline.
Contacts are closed when the UPS is operating in
Normal mode.
Contacts are closed when approximately two minutes of
battery time is remaining, before the critical load is lost.
Contacts are closed when Utility Failure is detected.