Ups And Critical Load Shutdown; Charger Control - Powerware 9390 Installation & Operation Manual

40–80 kva
Hide thumbs Also See for 9390:
Table of Contents

Advertisement

10.1.7 UPS and Critical Load Shutdown

To perform maintenance or service on the critical load, shut down power to the load by
performing the following procedure:

10.1.8 Charger Control

To turn the battery charger on or off, perform the following procedure:
Powerware
9390 UPS (40–80 kVA) Installation and Operation Manual S 164201535 Rev C
®
1. Turn off all equipment that is being powered by the UPS.
2. Perform the LOAD OFF procedure in paragraph 10.1.9.
The input, output, and bypass backfeed contactors open, the battery breaker or
disconnect is tripped, and the power module is turned off.
Power is present inside the UPS cabinet until the upstream input feeder circuit breaker is
opened.
3. Open the UPS input and bypass (if dual feed) feeder circuit breakers.
1. Press the CONTROLS pushbutton on the main menu bar. The System Control
screen appears.
2. Press the
pushbutton to display System Controls Screen 2.
3. Press the CHGR ON or CHGR OFF pushbutton on the System Controls menu bar
to toggle the charger on or off.
UPS Operating Instructions
W A R N I N G
10-5

Advertisement

Table of Contents
loading

Table of Contents