Powerware 9390 Installation & Operation Manual page 175

40–80 kva
Hide thumbs Also See for 9390:
Table of Contents

Advertisement

REMOVE DEBRIS SHIELD
COVERING EXHAUST GRILL
BEFORE OPERATING SYSTEM.
CONDUIT LANDINGS FOR
X---SLOT CONNECTIONS.
(REMOVE PANELS TO DRILL OR
PUNCH CONDUIT HOLES.)
TOP VIEW
Powerware
9390 UPS (40–80 kVA) Installation and Operation Manual S 164201535 Rev C
®
TOP ENTRY CONDUIT LANDING
FOR AC INPUT AND OUTPUT,
DC INPUT, DC CONTROL, AND
INTERFACE CONNECTIONS.
(REMOVE PANEL TO DRILL OR
PUNCH CONDUIT HOLES.)
DESCRIPTION:
DRAWING NO:
REVISION:
Installation Information
BOTTOM ENTRY CONDUIT
LANDING FOR AC INPUT AND
OUTPUT, DC INPUT, DC
CONTROL, AND INTERFACE
CONNECTIONS.
(REMOVE PANEL TO DRILL OR
PUNCH CONDUIT HOLES.)
BOTTOM VIEW
CONDUIT AND WIRE ENTRY LOCATIONS
164201535---6
DATE:
B
SHEET:
1 of 2
111504
A-27