Unpacking The Storagelibrary; Finding A Location For The Storagelibrary; Unpacking - Tandberg Data StorageLibrary T40+ Series Installation And User Manual

Professional tape backup and data protection solution
Table of Contents

Advertisement

This chapter provides detailed information for preparing the library location.
After the library is unpacked it needs to acclimatise for 8 hours before the power
Caution
is turned on.

Finding a Location for the StorageLibrary

The StorageLibrary must be located in a stable environment.
The StorageLibrary is designed to operate in a horizontal position. Do not attempt to operate the
StorageLibrary in any other position than horizontally.
Make sure a power source is available (On StorageLibrary with redundant power you need two
power sources).
Route any cable to avoid walking on them or pinching them with items placed on or against them.
Pay particular attention to the cord at the wall plug, and the point where the cord exits from the
StorageLibrary.
Make sure that objects will not fall and liquids will not spill into the chassis openings of the
StorageLibrary.
Make sure the airflow around the front and back of the StorageLibrary is not obstructed.
Make sure there is a minimum of 60 cm (24 inch) free space in front of the unit to allow the
operator to safely remove the magazines.
Make sure the display and operator controls can easily be accessed.
Make sure the StorageLibrary is away from the floor and in a clean environment with
temperatures within specifications. See Specifications.

Unpacking

You must remove the transport locking screws when powering up the unit
Caution
for the first time or it will not operate. This procedure is described in the
Hardware Installation
StorageLibrary T40+ Series Installation and User Guide
3

Unpacking the StorageLibrary

chapter.
3
19

Advertisement

Table of Contents
loading

Table of Contents