Ricoh Container Stacker Unpacking & Setup Instructions page 29

Table of Contents

Advertisement

8. Connect the AF cable of 4 pin white connector coming from the Container
Stacker 2 to the J680 on the ST09X P/K of the Container Stacker 1. (Connection 1
on the following illustration)
9. Take out the CST AC cable of 2 pin white connector from the Container Stacker 1
and connect it to the CST AC cable of 2 pin white connector of the Container
Stacker 2. (Connection 2 on the following illustration)
10. Take out the RB cable from the Container Stacker 1 and connect it to the RB
cable of Container Stacker 2. (Connection 3 on the following illustration)
11. Mount the CST FG cable coming from Container Stacker 1 on the frame of
Container Stacker 2 using M4 Screw (Connection 4 on the following illustration).
NOTE
Put the cable through opening "A" of the Printer.
On SW1 mounted on the CPXXX P/K, set switch No. 4 and No. 5 to ON
and set No. 2 and No. 8 to OFF. (Front Engine of 184 ppm)
Printer
1-24
Container Stacker Installation Instructions
:
RB cable
(For Container Stacker 2)
M4 screw
Connection 4
CST FG cable
Disconnection 1
(4 pin white)
184 ppm: Connect the CS Relay Cable (see Page 19 Step 21.
RB cable
(For Container Stacker 1)
AF cable
Connection 3
(4 pin white)
2
Container Stacker
(W/ Through path)
Connection 2
(2 pin white)
CST AC cable
70/92 ppm
Container Stacker 1
(W/ Sample tray)
Opening "A"
Connection 1
(20 pin black)
Disconnection 2
(2 pin white)

Advertisement

Table of Contents
loading

Table of Contents