Site Preparation

Backboard Installation

A wooden backboard is recommended for all installations and must be
installed when the location has masonry or plasterboard walls. A 1/2-inch
plywood material is sufficient for most installations. The backboard
should be mounted at a convenient height, about three feet above the
floor and be bolted in various places to distribute the weight of the
system.
Space should be available on the bottom side of the backboard for the
MDF cabling and for optional equipment such as a music source, battery
backup, etc. It is recommended that the location of each major item be
roughly sketched on the backboard as an installation layout.

Verify On-Site Equipment

Once the equipment installation site is identified and a dedicated AC
outlet, earth ground, and lighting and ventilation are available, verify that
all equipment required is on-site and was not damaged during shipment.
Unpack the KSUs to assure there is no shipping damage. Note that a
mounting template is packed with the BKSU; this template is required
later in the installation. Check that the type and quantity of boards
received is correct and optional equipment and a Power Line Surge
Protector are on-site. Do NOT unpack the individual boards at this time.
If any equipment is damaged or missing, notify the appropriate
personnel to correct the situation.