Operation; Operating The Work Management Screen - JUKI IP-110 Instruction Manual

Production support function
Hide thumbs Also See for IP-110:
Table of Contents

Advertisement

#. OPERATION

1. Operating the work management screen

On the work management screen, work data such as the operator ID, product number and process
number, which are to be embedded in the operation data recorded by each sewing machine are entered
and managed. In addition, the recoded operation data can be uploaded. Furthermore, on the work man-
agement screen, operatons requred for procedures such as count-up of the producton volume and
stopping of measurement can be carried out. This means that sewing work can be done with this screen
displayed.
Refer to "!. 2-3 Normal sewing
*
<Work management screen>
A. Display of the
current time of day
Production volume
count-up switch 1
Operator ID input switch 2
The operator ID entry popup screen appears. Input an eight-
digit figure there.
mode" for the operating procedure to be taken until this screen is displayed.
The quantity-of-items per lot entry popup screen appears. Input
the quantity of items per lot there.
Quantity-of-items per lot input switch 6
B. Display of the
latest pitch time
Process number input switch 4
The process number entry popup screen appears. Input an
eight-digit figure there.
Product number input switch 3
The product number entry popup screen appears. Input an
eight-digit figure there.
– 20 –
C. Display of the production volume
Measurement stop switch 7
Operation data upload switch 5

Advertisement

Table of Contents
loading

Table of Contents