In The Case Of Calculating The Target Production Volume According To The Specified Starting/Finishing Times Of Day Of Work And Total Production Volume - JUKI IP-110 Instruction Manual

Production support function
Hide thumbs Also See for IP-110:
Table of Contents

Advertisement

No.
Item to be set
Target pitch time setting
2
switch
Daily target production
3
volume setting switch
Current target production
4
volume correction switch
(2) In the case of calculating the target production volume according to the specified
starting/finishing times of day of work and total production volume
The target production volume as of the current time of day is calculated and displayed on the production
management screen under the sewing mode by setting data on the time period during which sewing work
is carried out such as the starting/finishing/resting times of day and a daily target production volume.
*
Three different working conditions
sewing machine, the machine should be used after the entry of working hours on an operator-by-
operator basis.
<Production management function setting screen (in the case of calculating the target produc-
tion volume by setting the starting/finishing times of day and the total production volume)>
Working condition selector switch 7
Input data on items 7 to 9 referring to the table given in the next item.
When Screen closing switch !1 is pressed, the screen is closed and restored to the previous screen.
When Clear switch !0 is pressed, the operating time and rest time and the daily target production vol-
ume of the selected working conditions
The target pitch time for sewing work is set. Every time the length of time
corresponding to the target pitch time is elapsed, the current target production
volume is counted up.
* When the switch is pressed, the numeric input popup screen is displayed. Input
a set value in the popup screen.
* When the target pitch time is changed, the current target production volume 4 is
automatically cleared.
The target production volume to be produced from the starting to the end of working
hours in a day is set.
* When the switch is pressed, the numeric input popup screen is displayed. Input
a set value in the popup screen.
The current target production volume that is counted up every time the length of
time corresponding to the target pitch time is elapsed can be corrected.
* When the switch is pressed, the numeric input popup screen is displayed. Input
a corrected value in the popup screen.
to
Screen closing switch !1
Daily target production volume setting switch 9
Working/resting times setting switch 8
to
Description
can be entered. When two or more operators use one
can be totally cleared.
– 15 –
Clear switch !0

Advertisement

Table of Contents
loading

Table of Contents