Installation With A Full-Height Partner Server Blade - HP EH920A - StorageWorks Ultrium 1760 Tape Drive User Manual

Hp storageworks ultrium tape blade user guide (509508-001, october 2008)
Hide thumbs Also See for EH920A - StorageWorks Ultrium 1760 Tape Drive:
Table of Contents

Advertisement

Installation with a full-height partner server blade

If you are installing with a half-height partner server blade, refer to
"Installation with a half-height partner server
When partnering the tape blade with a full-height server blade, an HP PCI Express Mezzanine Pass-Thru
Card is required (option kit part number: 431643-B21). The Mezzanine Card must be installed in
mezzanine 3 connector in the server blade. The exact location of this connector varies according to the
model of server blade. Please refer to the schematic on the server blade's panel or the server blade
documentation for detailed instructions on installing the Mezzanine Card.
NOTE:
The partner server blade must be installed and powered down before you install the tape blade. See the
documentation that ships with the server blade.
CAUTION:
To prevent improper cooling and thermal damage, do not operate the server blade or the enclosure
unless all device bays are populated with either a component or a blank.
1.
Identify the partner server blade to be installed with the HP StorageWorks Tape Blade. The two
blades always occupy a pair of device bays.
• c7000 enclosures: The tape blade is always located on the lower row of the enclosure
(bays 9 to 16).
Partner server blade in bays:
HP Tape Blade in bay:
24
Installing an HP StorageWorks Tape Blade
blade" on page 20.
1/9
2/10
3/11
4/12
10
9
12
11
5/13
6/14
7/15
8/16
13
16
15
14

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storageworks tape blade

Table of Contents