Removing The Connector Cover; Installing The Tape Blade, Partnered With A Full-Height Server Blade - HP EH920A - StorageWorks Ultrium 1760 Tape Drive User Manual

Hp storageworks ultrium tape blade user guide (509508-001, october 2008)
Hide thumbs Also See for EH920A - StorageWorks Ultrium 1760 Tape Drive:
Table of Contents

Advertisement

5.
Remove the connector cover on the rear of the tape blade assembly. Release the back of the cover
(1) and pull the cover away from the tape blade (2).
Figure 13 Removing the connector cover
CAUTION:
To prevent damage to the backplane connector, take special care when handling the tape
blade assembly. If the tape blade is installed with a damaged connector, the enclosure
backplane may also be damaged.
6.
Install the tape blade, ensuring that it is in the correct orientation: in a c7000
enclosure the latch is at the bottom of the blade assembly, as illustrated; in a
horizontal orientation in a c3000 enclosure it is to the right of the tape blade. In
"Installing the tape blade, partnered with a full-height server
blade is installed in device bay 9. So, the tape blade must be installed in device bay 10. Carefully
push the tape blade into the device bay (1) and push the latch in to secure the blade in position (2).
Figure 14 Installing the tape blade, partnered with a full-height server blade
7.
Now go to
"Powering the tape blade on and
When installing the HP StorageWorks Tape Blade with a full-height server blade, a half-height server
blade can be installed in the empty bay next to the tape blade. (In a c7000 enclosure this is the
bay above the tape blade. In a c3000 enclosure this will be bay 4.) This server blade cannot be
partnered with the HP StorageWorks Tape Blade.
If the bay is left empty, a blank must be fitted to maintain proper airflow for cooling.
blade" on page 27 the partner server
off" on page 28.
27
Tape Blade

Advertisement

Table of Contents
loading

This manual is also suitable for:

Storageworks tape blade

Table of Contents