Chapter 3
Installing the Router
Before You Begin
Freestanding Installation
This chapter describes how to install the router. It contains the following sections:
Before You Begin on page 23
Freestanding Installation on page 23
Rack-Mounted Installation on page 25
The Next Step on page 26
Before installing the router, be sure you:
Have a plan for installing the router that takes into consideration future expansion
of your system.
Have the tools and accessories needed to complete the installation.
Read and understand the clearance requirements for the front and back of the
chassis for cable routing and other unit access. See "Environmental
Requirements" on page 97 for more information.
Read and understand the clearance requirements for the top and bottom of the
chassis to ensure adequate ventilation.
Prepare the equipment racks by measuring and marking space for each router
and plenum you plan to install.
When installing the system on a table top or in any other freestanding mode, be sure
to leave enough space around the system for adequate ventilation. Position the router
with easy access to the connections that it needs for power, local communications,
and remote communications.
See "Installation Guidelines and Requirements" on page 97, and "System
Specifications" on page 91, for more information.
WARNING: Two people are required to lift the router.
23
Before You Begin