Chapter 2
Unpacking and Inspecting the Router
Before You Begin
Unpacking the Router
This chapter reviews shipping contents and unpacking procedures for the router. It
contains the following sections:
Before You Begin on page 19
Unpacking the Router on page 19
Inspecting Router Components and Accessories on page 20
If You Detect or Suspect Damage on page 21
Contacting Juniper Networks on page 21
The Next Step on page 21
Before you begin unpacking the router, be sure you have the following tools:
A No. 2 Phillips screwdriver
A utility knife
A mechanical lift, or at least two people to assist in lifting
The router is delivered boxed, bolted, and strapped to a skid. For your convenience,
we recommend that you unpack the router in the location where you want to install
it.
WARNING: Three people are required to install the router in a rack: two to lift the
system into position and one to screw it to the rack.
19
Before You Begin