E120 and E320 11.1.x Hardware Guide
Required Tools and Safety Items
You need the following tools to install a line module:
Safety Guidelines
Before and during the installation process, observe the following precautions:
WARNING: Do not work on the system or connect or disconnect cables during
lightning activity.
WARNING: Be sure circuit breakers for the power source are in the OFF position
before attaching power cables.
WARNING: Remove jewelry (including rings, necklaces, and watches) before working
on equipment that is connected to power lines. Metal objects heat up when connected
to power and ground and can cause serious burns or become welded to the terminals.
WARNING: Do not insert any metal object, such as a screwdriver, into an open slot
or the midplane. Doing so can cause electric shock and serious burns.
WARNING: Never attempt to repair parts of modules yourself. Only trained customer
service personnel are authorized to service parts. Call Juniper Networks Customer
Service to make arrangements to return defective modules for repair.
Installing an SRP Module or SFM Module
You must install SRP modules in slot 6 or slot 7, and SFM modules in slots 8, 9, or
10. Four of the five fabric slots (SRP and SFM modules) must have a module installed
for the router to function. A minimum system configuration requires all three SFMs
and at least one SRP module to be installed. See "Fabric Slices" on page 10 for more
information.
To install an SRP module or SFM module:
38
Safety Guidelines
A No. 2 Phillips screwdriver
A flathead screwdriver
An ESD wrist strap or other grounding device